A downtime report that lists every job gets filed unread. One that answers 3 questions gets taken into a budget meeting: which equipment cost you the most, what happened during service hours, and what to do about it before next quarter. Everything else is an appendix.

The short version

Most service reports are written from the service company's side. Jobs completed, response times met, work delivered. That is a defense of your invoice rather than something useful to the person reading it.

A facilities manager at a group has a different problem. They are managing an portfolio on a budget, they are asked why the equipment keeps failing, and they need something they can forward upward without rewriting it.

So the report that gets read is built around their decisions rather than your activity:

  • Which equipment are consuming the budget
  • Which failures landed during service hours
  • What is likely to fail next, and what it would cost to get ahead of it
  • One page, with the detail behind it available if asked

Measure downtime, not response time

Response time is the metric your contract is judged on and it is not the number your customer feels.

What a kitchen manager experiences is the equipment being unavailable. That clock starts when the equipment stops, which is often before anyone reports it, and ends when it is working again, which may be days after your visit if a part had to come.

Reporting only on response time produces the familiar disconnect where every target is met and the customer is unhappy. Both things are true. You arrived quickly and their fryer was down for four days waiting on a control board.

So report both, and separate them honestly:

MeasureWhat it capturesWho controls it
Response timeTicket to arrivalYou
Time to repairArrival to workingYou, plus parts availability
Total downtimeFailure to workingShared, and it is what the customer feels
Downtime during serviceThe hours that hurtNeither of you, and it is the number that gets attention

The fourth row is the one that changes a conversation. Twelve hours of downtime overnight is an inconvenience. Two hours during Friday service is a different subject, and separating them is honest rather than flattering.

Rank by equipment, because that is where the decisions are

A report organized by site tells the customer where their problems are. A report organized by equipment tells them what to do.

Site-level reporting produces the response every facilities manager has heard: store 212 has a lot of failures. That leads nowhere, because a site is not a thing you can replace or maintain differently.

Equipment-level reporting produces a ranked list, and the top of that list is almost always shorter than anyone expects. A handful of units usually carry most of the failures and most of the spend, and naming them converts a general complaint into four decisions.

Doing this requires jobs attached to equipment with their serial numbers and location history intact. Under a customer or an address, "what has this unit cost" is an afternoon of reading invoices, which is why most service companies report activity instead.

The 1 page that gets forwarded

Write for the person your contact has to convince, not for your contact. They will forward it, and it has to survive the forwarding without you in the room.

What belongs on it:

  1. The period, the portfolio covered, and the headline. Total jobs, total downtime hours, and how much of it fell during service
  2. The top five pieces of equipment by downtime, each with its site, what it is, and one line of what has been happening
  3. Anything with a pattern. Repeat failures on one unit, several pieces of equipment failing the same way at one site, or a seasonal cluster
  4. Recommendations, split three ways. Replace, put on a tighter maintenance interval, or leave alone
  5. What it would cost to act on the first two, and what the last year cost on those pieces of equipment without acting

What does not belong: a list of every job, response time tables that only prove you met your obligations, and anything that reads as a defense. Those go in an appendix or in the system they can log into.

Recommendations are the reason the report exists

A report with no recommendations is data, and data gets filed.

The recommendation section is where a service company either becomes an advisor or stays a supplier. It is also where credibility is made or lost, because the reader is checking whether every recommendation happens to be something you would bill for.

Three things make it land. Name the equipment rather than the category, so the recommendation is specific and checkable. Include the equipment you are recommending no action on, because that is the part a supplier with only an interest would leave out. And state the cost of doing nothing next to the cost of acting, using that equipment's own last twelve months rather than an industry figure.

Where a replacement is the recommendation, the capital conversation has its own shape and its own timing, and the report is usually where it starts rather than where it is settled.

Cadence, and who it goes to

Quarterly for most group customers, monthly only where volume genuinely justifies it.

Monthly reporting on a small portfolio produces noise. Three failures in a month is not a pattern, and reporting it as one trains the reader to skim. Quarterly gives enough data for the ranking to mean something and matches how most facilities budgets are reviewed.

Two timing points worth knowing. Send it before their budget cycle rather than after, since a recommendation arriving after the numbers are set waits a year regardless of merit. And send it whether or not it was requested. Most facilities managers have never been handed this analysis, which is precisely why it gets remembered.

Building it from what you already have

The report is a byproduct of equipment-level records rather than a separate exercise.

What it needs is the job attached to the unit, with the failure time and the restored time recorded rather than only the visit. That is two fields, and capturing them is the only new habit involved.

Holding manufacturer, model, serial number, service history, location history and warranty agreements against the equipment is what makes the ranking a filter rather than a project. Roopairs keeps those on the equipment record, with planned maintenance contracts there too, which is also where the tighter-interval recommendations end up living.

If parts availability is driving your downtime rather than response, that shows up here too, and it points at the parts chain rather than at scheduling. Roopairs has written about keeping purchase orders and inventory with the work order, which is where that particular delay is created.

Roopairs runs a product tour where you can build this view for one of your own multi-site customers.

What service companies in the trade say

“App is very well laid out and very easy to use. I definitely appreciate the simplicity to using the app, but the fact that it also provides so much functionality.” — Mikah Levitt-Freimuth

Also worth reading

Frequently asked questions

What is a downtime report?

A summary of how long equipment was unavailable over a period, which equipment it happened to, and what caused it. For a service company reporting to a customer, the useful version ranks equipment by downtime and cost and ends with recommendations rather than with a list of completed jobs.

How can I track downtime for equipment?

Record two timestamps alongside the job: when the equipment stopped working, which usually comes from the customer, and when it was working again, which may be later than your visit if parts were needed. Those two plus the equipment identity produce every figure a downtime report needs.

How do you make a downtime report a customer will read?

One page, ranked by equipment rather than by site, separating downtime during service hours from downtime in total, ending with recommendations split into replace, maintain differently, and leave alone. Everything else goes in an appendix. Write it for the person your contact forwards it to.

How do you analyze equipment downtime?

Rank equipment by total downtime and by repair spend, then read the individual jobs on the worst few rather than counting them. What you are looking for is whether the failures repeat, cluster at one site, or follow your own previous visits, since each of those points at a different action.

Should the report include response times?

Include them, and do not lead with them. Response time proves you met the contract, which matters at renewal and does not help the reader make a decision. Total downtime is what they feel and what their own management asks about.

How often should we send one?

Quarterly suits most group customers, and monthly only where the portfolio is large enough that a month produces a real pattern. Time the quarterly one to land before their budget review rather than after it, since that is what decides whether a recommendation can be acted on this year.

Ready to grow?