
Build the number from a visit rather than an hour, using 5 inputs you can measure before signing. The 1 that decides most contracts is time per piece of equipment type, and almost nobody has measured it because nobody records maintenance visits at equipment level.
Most PM contracts are priced by feel. Somebody estimates a day per site per quarter, adds a margin, and quotes it. It works often enough to survive and fails invisibly when it does not, because the loss is spread across a year.
The alternative is not complicated. A maintenance contract is a known quantity of work repeated on a schedule, which makes it the most calculable thing a service company sells.
What stops service companies calculating it is a missing measurement, and that measurement takes one quarter to collect.
| Input | Where it comes from |
|---|---|
| Time per piece of equipment type | Measured on your own visits. The input nobody has |
| Visits per piece of equipment per year | Equipment type, duty and the unit's own history |
| Travel per site visit | Drive time at the hours you dispatch, both directions |
| Consumables included | Filters, seals and anything with a scheduled life |
| Administrative load | Reporting, scheduling and consolidated invoicing on multi-site work |
The first row is the whole exercise. Everything else is arithmetic once you know how long a combi oven service actually takes in your hands rather than in a manufacturer's schedule.
The single change that turns this from an estimate into a price.
On every maintenance visit for a quarter, record the time spent per piece of equipment rather than per visit. Not to the minute. To the nearest ten minutes, on a list of equipment types.
What comes out is usually surprising in both directions. The units people assume are quick have hidden work, and some of the ones treated as major turn out to be routine.
You also get the variance, which matters as much as the average. A piece of equipment type that takes twenty minutes on a good site and an hour on a bad one is telling you that site conditions, not the equipment, are the cost driver.
This requires visits recorded against equipment rather than addresses. Roopairs holds planned maintenance against the equipment record, which is what makes the measurement a report rather than a stopwatch exercise.
An hourly rate hides everything around the work.
A site visit costs travel out, time getting to the equipment, the work itself across however many pieces of equipment are due, the closeout, and travel back. On a site forty minutes away, two hours of maintenance is a three and a half hour visit.
Build it in this order:
Then multiply by visits per year and you have an annual cost you can defend line by line, which is also what makes a price reduction conversation manageable later.
The common case, and it has two honest answers.
A prospect wants a price and you have no asset list, no history and no idea what condition anything is in. Quoting confidently there is guessing with a decimal point.
The first answer is a survey priced as separate work before the contract starts. Manufacturer, model, serial and approximate age on every unit. Groups frequently agree to this because most cannot say what equipment they own, and it converts your largest unknown into a number.
The second is a first-year price with a stated review, quoted from banded assumptions you write into the proposal. "This assumes fourteen units of these types in serviceable condition" is a defensible position, and it gives you a route to correct it.
What is not an answer is quoting from a competitor's price. You do not know what their scope was.
None of them appears in the pricing calculation and all three erode it.
Extra work absorbed. A technician on site for maintenance fixes something else, no separate job is created, and the customer learns that small repairs come free. This is the largest leak by a distance.
Equipment added without the price moving. The portfolio grows and the invoice does not, because there is no change clause and nobody reviewed the schedule.
Visits slipping. Billing in advance continues on schedule while the maintenance falls behind, which looks profitable and is a liability accumulating.
All three are prevented by the same thing: visits recorded per piece of equipment against the contract, and a fifteen minute annual review comparing what is covered against what is billed.
You are pricing a year of work you have not done. Assume something is wrong.
An annual review with named triggers, such as visit volume or equipment count exceeding the assumptions by a stated margin, is the cheapest protection available. It converts a mispriced contract into a twelve month problem rather than a three year one.
Pair it with a change clause covering equipment added, replaced or removed, and sites opening and closing. Between them, the price stays connected to the work.
Four numbers, annually, and each comes from records you already generate.
Revenue billed. Visits delivered against visits due, because an underdelivered contract is a liability rather than a profit. Realized cost including travel and included consumables. And reactive work generated at that customer, which frequently changes the conclusion.
That fourth number is the one service companies leave out and it reverses more decisions than any other. A maintenance contract that looks marginal alone can be the reason a customer calls you first for everything else.
Which is worth knowing explicitly rather than assuming in either direction, because some agreements genuinely are loss leaders that lead nowhere.
Roopairs runs a product tour where you can see maintenance schedules held per piece of equipment with the visits and costs behind them.
“Great process getting set up and rolling with Roopairs. We transitioned from a different platform and my crew was able to Master Roopairs with ease.” — Chris Sockriter
From a visit rather than an hour, using five inputs: time per piece of equipment type, visits per piece of equipment per year, travel both ways at the hours you attend, consumables included, and administrative load. Time per piece of equipment type is the one nobody has measured.
Record time per piece of equipment rather than per visit on every maintenance job for a quarter, to the nearest ten minutes, on a short list of equipment types. The variance matters as much as the average, because it identifies sites rather than equipment as the cost driver.
Price a survey as separate work before the contract starts, or quote a first-year price from stated assumptions with a written review. What does not work is quoting from a competitor's number, since you do not know what their scope covered.
Because a visit includes travel both ways, access and setup, the work across whichever equipment are due, and closeout. On a site forty minutes away, two hours of maintenance is a three and a half hour visit.
Extra work absorbed during maintenance visits, equipment added without the price moving, and visits slipping while billing continues on schedule. All three are prevented by recording visits per piece of equipment and reviewing the schedule annually.
Revenue billed, visits delivered against visits due, realized cost including travel, and reactive work generated at that customer. The last is usually omitted and it reverses more conclusions than any of the others.
The all-in-one platform built for commercial kitchen service companies. Dispatch, invoicing, parts ordering — all in one place.
Book a product tour →