
A commercial HVAC maintenance contract needs 8 parts: an equipment schedule listing every unit by make, model and serial, visit frequency, the tasks per visit, response times, exclusions, how parts and refrigerant are billed, the pricing method, and renewal terms. Price it from measured labor hours per unit, not from a competitor's number.
It covers 8 things, and each one answers a question the customer would otherwise raise mid-dispute. The table is the structure, not a template.
| Part | What it has to state | What happens without it |
|---|---|---|
| Equipment schedule | Every covered unit with location, make, model, serial, tonnage, filter sizes and belt sizes | The customer adds two units and the price never moves |
| Visit frequency | Visits a year per unit, and which months | Visits drift and the billing does not |
| Scope per visit | The task categories for each visit type, including the heating and cooling changeovers | Every technician does a different visit |
| Response times | Priority levels, when the clock starts, and the hours each applies to | "Priority service" means whatever the customer needs it to mean |
| Exclusions | What is billed outside the contract, by name | A compressor swap gets argued as maintenance |
| Parts and refrigerant | Which consumables are included, how repair parts and refrigerant are billed | Small parts leave the van free |
| Pricing method | Annual price, billing schedule, and what triggers a change | No route to correct a mispriced year |
| Term and renewal | Start date, length, notice period, how the renewal price is set | The contract lapses and nobody notices until a unit fails |
Walk-ins and reach-ins on the same site go on their own schedule, with different intervals, exclusions and refrigerant records, which is why commercial refrigeration maintenance contracts are structured separately.
Because the price, the visits and every later argument point back to it. A contract that says "HVAC maintenance at 400 Main Street" covers whatever the customer decides is on the roof that day.
A schedule that holds up lists each unit on its own line: location on site ("RTU-3, above dining room"), manufacturer, model and serial number read from the nameplate, tonnage and heat type, filter sizes and count, belt sizes, and condition at the start of the contract with photos.
The condition line protects you. A 20-year-old rooftop unit with a rusted heat exchanger enters the contract with that written down, so its failure in year two is a known risk.
Add one clause in the same section: units added or removed change the price at the per-unit rate in the schedule. That sentence closes the quietest leak a commercial HVAC service contract has.
Twice a year at the heating and cooling changeovers is the floor, and quarterly suits sites that load filters fast. The right number comes from the site, the equipment and its history.
A restaurant pulls cooking air across its rooftop units and makeup air units, and the filters and coils show it. An office or a school can often hold to two full visits with a filter stop between.
Write the frequency per unit, not per site. A makeup air unit may need filters quarterly while the unit over the office needs them twice a year.
The full task list belongs in a checklist. The contract names the categories so the customer knows what was bought: filters at every visit, belts inspected every visit and replaced once a year, coils cleaned at a stated interval, condensate drains cleared, electrical and controls checked, and the heat section before winter and the refrigerant circuit and economizer before summer.
They should say when the clock starts and what is billed separately, in plain words. Vague language here turns a good contract customer into an angry one.
A response commitment needs priority levels (a unit down over a full dining room is not a noisy fan), the event that starts the clock, and the hours it applies to. Four hours from a Tuesday call is not four hours from a Saturday night voicemail.
When a customer sends work through a facilities management portal such as ServiceChannel or Corrigo, the portal usually carries its own response window. Match the contract to it rather than writing a second number someone will hold you to.
An exclusion says the work is quoted separately, usually at a discounted labor rate for contract customers.
Consumables are in the price, repair parts are billed, and refrigerant is billed by the pound at a stated rate. Writing all three down stops small parts leaving the van free.
Filters and belts are known quantities from the schedule, so they belong in the price. Capacitors, contactors and igniters are not. The contract says whether they are billed at list or at a contract discount, and a repair part bought on a purchase order gets attached to the job it was bought for, or it never reaches the invoice.
Refrigerant needs its own line: price per pound, the types covered, and quantity added or recovered per unit per visit. On larger systems that record is a compliance matter, and it only adds up if it lives on the unit rather than in a job note.
Add up the hours a year of visits will take, cost them at your loaded labor rate, add consumables, and divide by one minus your target margin. Every input can be measured, which is why the price can be defended.
Here is the method on a hypothetical site. The numbers are an example, not a benchmark: a restaurant with 4 rooftop units and 1 makeup air unit, 4 visits a year, a loaded labor cost of 95 dollars an hour, and a 40 percent target gross margin.
| Line | Working | Per year |
|---|---|---|
| Time on units | 5 units x 0.75 hours x 4 visits | 15 hours |
| Travel | 1 hour round trip x 4 visits | 4 hours |
| Closeout and report | 0.25 hours x 4 visits | 1 hour |
| Labor cost | 20 hours x 95 dollars | 1,900 dollars |
| Filters | 5 units x 4 changes x 35 dollars a set | 700 dollars |
| Belts | 5 units x 1 change x 30 dollars | 150 dollars |
| Total cost | Labor plus consumables | 2,750 dollars |
| Contract price | 2,750 divided by 0.60 | About 4,580 dollars, or about 1,145 dollars a quarter |
Watch the last line. Adding 40 percent to cost gives 3,850 dollars, a margin under 29 percent. Dividing the cost by 60 percent is what lands the margin you set.
The weakest input is the first row. Time per unit is the number most often guessed, and recording time against each unit for one quarter of visits replaces the guess.
Sell it right after the customer has paid for a failure, and renew it with a year of visit records in hand. Both conversations are easier when the numbers come from the equipment rather than memory.
The best opening is a repair call. The unit that failed has dirty coils and a cracked belt, and the units next to it look the same. A short report with photos per unit, sent that day with a proposal, does more than a brochure.
Multi-site customers want one contract, one price per unit type and one invoice. If they cannot tell you what is on their roofs, price an equipment survey as its own job first, or quote from stated assumptions with a review after the first visit.
Start the renewal 60 to 90 days before the end date with three things: visits completed against visits promised, repair work billed per unit, and units whose condition changed. A unit with four repair calls this year is a replacement conversation. Adjust the price with the reason written beside it, and see what a good contract base looks like.
By holding the contract against each unit's record rather than the customer's address. Then RTU-3 has its own history of visits, repairs and refrigerant, and you can see which unit is eating the hours.
Roopairs is built around that structure. The equipment record carries manufacturer, model, serial, service history, location history and warranty agreements with partner manufacturers, and planned maintenance contracts are held against the equipment. Scheduling tracks the percentage of available hours per technician, which tells you whether the next contract fits the crew you have. Roopairs also works with third-party facilities management software, so portal calls and contract visits land on the same units.
Roopairs runs a product tour where you can see equipment records, planned maintenance contracts and service history per unit in one place.
“One feature that stands out to me is the ability to track spending on each piece of equipment for my customers.” — Martin Turner
Usually, yes. Some service companies use "service contract" for agreements that also cover repair labor and "maintenance contract" for scheduled visits only. The scope and exclusions should say which one the customer bought.
One year with automatic renewal gives both sides a natural review point. Multi-year terms suit multi-site customers who want a fixed budget, as long as the contract carries an annual price adjustment.
Usually not. Including repairs turns a maintenance contract into insurance on aging equipment, and the price has to carry that risk. A discounted repair labor rate rewards the customer without taking on the failure risk.
The per-unit rate in the equipment schedule applies from the next billing period. Without that clause the new unit gets serviced free until renewal.
Separate schedules at least, and often separate contracts. Walk-ins and reach-ins run different intervals, tasks and refrigerant records from rooftop units, and mixing them hides which side is profitable.
The all-in-one platform built for commercial kitchen service companies. Dispatch, invoicing, parts ordering — all in one place.
Book a product tour →